The 7 garage doors and their openers are installed and working, every mans dream "7" garage doors! The windows and exterior doors were delivered and the first exterior doors have been installed in the shop areas. All the shop walls are now framed including the framing for our walk in cooler in the deer processing area. The electrician has started and as I type, is continuing this evening installing the boxes for outlets, switches and light fixtures. The front porch concrete did not get poured, though they are ready. It was too hot today and the first delivery time slot of the morning was already taken and it is taken for the next couple of days. They have it set up for Tuesday morning next week. Also, Wednesday morning next week is set up to dig the trench from the power "pedastal" to the house, then the conduits will be laid and the two 200 Amp feeds will be pulled. By the end of next week we will have power in the house!

I have now selected the plumber, HVAC and boiler contractor (same person) so that work should start hopefully next week. We need to get the rough-in for those going also. I talked with the drywall person today and gave him a heads up that we are within 4-6 weeks being ready to start hanging drywall if all goes well.


Two storage areas doors done.

4 front garage doors done.
Some of the windows and exterior doors, ready for installation.
Framing for walk-in cooler being finished, can't wait to install the cooler!
First electrical item being installed!
Front porch leveled, plastic down, mesh panels down, ready for concrete next week.
First exterior siding being installed. The bottom 3 feet will be Green, the rest of the siding will be Ivory.