Thursday, May 10, 2012

Fireplace, Porch and Electric


The fireplace has has now been rough framed in, the front porch concrete has been poured and the two 200 Amp power feeds have been pulled into the house. They have also started to frame the roof of the porch and should finish that today, then start putting the metal roof on the porch. The eletrician will be back today to finish mounting and wiring the two main electrical panels, by end of day today, we should have power inside the house at the panels.

Heading home today so we can move everything out of the house and into storage. By the end of this weekend, we should be moved out of the house. Closing still set for next Wednesday.


Fireplace rough framed, need to put pipe in, then ready for mesh, plaster, then stone.
Pouring and finishing front porch concrete.
Trench from power pedestal to house conduits.
Conduits inistalled, closest one feeds house panel in utility room, the far one feeds the electical panel in shop areas.
Framing the roof on the ftont porch, going to be nice for some "front porch sittin".
Electrical panel in shop area, mounted and nearly ready to be energized.


1 comment:

  1. Unbelievable progress! I bet you are all relieved that the house selling process is behind you now. I see that you found someone to do the "PEX" pipes.... Also... I think that porch needs a few rocking chairs! :)