Monday, January 30, 2012

We met with the builder and excavator and staked off the foundation. As soon as the excavator is available we will be breaking ground, likely mid-February. All the paperwork has been submitted to the power and water company so that ball is rolling too. Everything is also set with the building center who will supply all the materials, we have largely picked out the roof and siding colors, windows, exteriror doors and tubs at this point. Pretty much everything we need to get it framed, under roof and weather tight has been picked out. We did talk to our builders brother in-law (both Amish), about building us custom cabinets and vanities out of hickory, as soon as we are framed up we will have him out to measure and give us a price.