The sewage system is in the ground, the conduit out to the satellite, the ThermoPEX piping out to the boiler and the copper line to the propane tank are all in the ground. The phone line and water line also now are run into the crawl space under the house. We now have 10 of 15 downspouts routed away from the house too. The kitchen is ready for the granite counter tops to be measured, which is planned for tomorrow. The vanities and linen closets have been set in all three bathrooms and the vanities tops are here and ready to be installed. The cabinets/ vanities should be completed by end of day Friday. Then it will take a couple weeks to get the granite counter cut and installed, will be pushing it to get it in before we start moving items into the house, but we can deal with it if we don't get it in time.

"NPDES" Sewage System - An EPA approved min-sewage plant that discharges clean water out the other side, no leach  beds required, very nice! It even has a phone line connected to it that calls for service automatically when something is out of spec.

Filling the system with water so the tanks don't flout out of the ground.

Kitchen is coming along nicely. This will all be done except counter tops this Friday.

Ditch out back of the house to where the boiler and propane tank will be.

Yellow pile is for propane, black pipe is the ThermoPEX pipe to bring the hot water from/back to the boiler, the gray conduit is for power out to the boiler/ lights & power in the pavilion.

More of the downspout drains, only 5 to go and we'll be done and all the water will drain away from the house.