Great progress has been made over the past week. All the floor joists are in and the sub-floor is installed. The shop areas that I plan to heat were prepared for us to install the vapor barrier, insulation, wire mesh and the PEX piping. Over the weekend, Lorrie, Christopher and I completed the installation of the PEX piping.