The foundation for the entire structure is about 60% complete. Next week they will finish all the block work and be ready to start building the sub-floor. If all goes as planned, next weekend we will install the PEX piping for the radiant floor heat in the garage and shop floors that we intend to heat with the outside wood boiler. The weather forecast looks great so I hope this plan holds together.