I am finally back from all my business travel. In the past 6 weeks I have been in Florida, Texas and Colorado, glad to be back so I can keep better tabs on things. Things are moving along. the Plumbing rough-in is now complete, the electrical and HVAC rough-in needed to start drywall will be completed tomorrow. The drywall is getting delivered on Monday and the drywall guys will be here to start hanging it upstairs on Tuesday.
|
The "back porch" has been roughed in, just needs some finishing touches and it will be done. We are leaving this one with a gravel floor and open ceiling. We plan to put tractor implements under here to keep them out of the weather. |
|
We ordered a "Big Ass Fan" for the great room. It will be 9 feet in diameter, with a silver motor and walnut blades. It moves the air of 9 52" ceiling fans and consumes the power of 1! |
|
Picture of the great room with insulation in the side walls. The ceiling will be T&G pine so it can be insulated after the drywall starts, once the electrician has the recessed lighting installed, which will be next week. |
No comments:
Post a Comment